ADOT has 2 widening options for I-10 in Chandler

by Kevin Reagan | San Tan Sun

Westbound Interstate 10 traffic was backed up for several miles on April 20. ADOT (2019)

The Arizona Department of Transportation has proposed a number of infrastructure improvements to the section of Interstate 10 running through Chandler.

After studying the busy freeway and collecting public input for the last year, ADOT officials have several options for reducing congestion and improving safety along that stretch of the highway.

The 26-mile stretch of freeway running between Phoenix and Casa Grande is notorious for being the site of several deadly accidents and backed up traffic.

ADOT launched a study last summer to examine the feasibility of widening I-10 by a couple lanes and refurbishing several overpass bridges.

Continued: